Winter Tile Projects: Planning a Natural Stone Remodel Before Spring

Winter is a good time to plan a tile project. Contractors are often easier to book, and you have time to choose well instead of rushing. If you want your kitchen or bathroom finished by spring, here is how to use the next few months.

Month one: decide and sample

  • Choose the room and set a budget.
  • Narrow your stone with the stone color guide and compare marble and travertine.
  • Order samples. Look at them on cloudy days and in the evening, as well as in sunlight, since winter light is different from summer light.

Month two: measure and plan

  • Measure every surface and add about 10% for cuts. Use the how much tile guide.
  • Choose your trim and mosaics so everything comes from the same stone. See the trim guide.
  • Send a long list to our project quote page if you want help with quantities.

Month three: order and prepare

  • Place the full order at once, with a spare box. Natural stone varies from lot to lot.
  • Choose shipping or pickup in Anaheim. Freight needs a clear delivery spot.
  • Open and check the boxes before your installer starts.

Why order early

Stone is heavy and some finishes and sizes sell out. Ordering before your installer's start date avoids waiting. It also gives you time to deal with any issue under our 30-day return policy.

After installation

Seal the stone and follow the care guide. Wet rooms need sealing again from time to time.

Contractors and designers can apply for a trade account. Tilefornia is at 530 E Cerritos Ave, Anaheim. See our Anaheim tile store page or call (657) 262-6330.

Back to blog